Active Projects Assigned to Processing Setup Team
Updated on October 28, 2021 | View Project
9% Progress

3% Timing

Timeframe
October 28, 2021 → November 27, 2021
Current Phase
100 - Ordering & Submission
Updated on October 28, 2021 | View Project
9% Progress

3% Timing

Timeframe
October 28, 2021 → November 27, 2021
Current Phase
100 - Ordering & Submission
Updated on October 28, 2021 | View Project
9% Progress

4% Timing

Timeframe
October 28, 2021 → November 19, 2021
Current Phase
100 - Ordering & Submission
Updated on October 27, 2021 | View Project
9% Progress

6% Timing

Timeframe
October 27, 2021 → November 26, 2021
Current Phase
100 - Ordering & Submission
Updated on October 27, 2021 | View Project
9% Progress

6% Timing

Timeframe
October 27, 2021 → November 26, 2021
Current Phase
100 - Ordering & Submission
Updated on October 22, 2021 | View Project
9% Progress

23% Timing

Timeframe
October 22, 2021 → November 21, 2021
Current Phase
100 - Ordering & Submission
Updated on October 21, 2021 | View Project
9% Progress

26% Timing

Timeframe
October 21, 2021 → November 20, 2021
Current Phase
100 - Ordering & Submission
Updated on October 18, 2021 | View Project
9% Progress

36% Timing

Timeframe
October 18, 2021 → November 17, 2021
Current Phase
100 - Ordering & Submission
Updated on October 14, 2021 | View Project
9% Progress

50% Timing

Timeframe
October 14, 2021 → November 13, 2021
Current Phase
100 - Ordering & Submission
Updated on October 7, 2021 | View Project
9% Progress

56% Timing

Timeframe
October 7, 2021 → November 15, 2021
Current Phase
100 - Ordering & Submission
Updated on October 7, 2021 | View Project
9% Progress

100% Timing

Timeframe
October 7, 2021
Current Phase
100 - Ordering & Submission
Updated on October 7, 2021 | View Project
9% Progress

75% Timing

Timeframe
October 7, 2021 → November 5, 2021
Current Phase
100 - Ordering & Submission
Updated on October 6, 2021 | View Project
9% Progress

32% Timing

Timeframe
October 6, 2021 → December 15, 2021
Current Phase
100 - Ordering & Submission
Updated on October 5, 2021 | View Project
9% Progress

80% Timing

Timeframe
October 5, 2021 → November 4, 2021
Current Phase
100 - Ordering & Submission
Updated on September 30, 2021 | View Project
9% Progress

96% Timing

Timeframe
September 30, 2021 → October 30, 2021
Current Phase
100 - Ordering & Submission
Updated on September 27, 2021 | View Project
9% Progress

100% Timing

Timeframe
September 27, 2021 → October 27, 2021
Current Phase
100 - Ordering & Submission
Updated on September 24, 2021 | View Project
9% Progress

100% Timing

Timeframe
September 24, 2021 → October 24, 2021
Current Phase
100 - Ordering & Submission
Updated on September 22, 2021 | View Project
9% Progress

100% Timing

Timeframe
September 22, 2021 → October 22, 2021
Current Phase
100 - Ordering & Submission
Updated on September 22, 2021 | View Project
9% Progress

100% Timing

Timeframe
September 22, 2021 → October 22, 2021
Current Phase
100 - Ordering & Submission
Updated on September 22, 2021 | View Project
9% Progress

100% Timing

Timeframe
September 22, 2021 → October 22, 2021
Current Phase
100 - Ordering & Submission
Updated on September 20, 2021 | View Project
9% Progress

100% Timing

Timeframe
September 20, 2021 → October 20, 2021
Current Phase
100 - Ordering & Submission
Updated on September 16, 2021 | View Project
9% Progress

100% Timing

Timeframe
September 16, 2021 → October 16, 2021
Current Phase
100 - Ordering & Submission
Updated on September 15, 2021 | View Project
9% Progress

100% Timing

Timeframe
September 15, 2021 → October 15, 2021
Current Phase
100 - Ordering & Submission
Updated on September 14, 2021 | View Project
9% Progress

100% Timing

Timeframe
September 14, 2021 → October 14, 2021
Current Phase
100 - Ordering & Submission
Updated on August 26, 2021 | View Project
9% Progress

100% Timing

Timeframe
August 26, 2021 → September 20, 2021
Current Phase
100 - Ordering & Submission
Updated on August 26, 2021 | View Project
9% Progress

100% Timing

Timeframe
August 26, 2021 → September 25, 2021
Current Phase
100 - Ordering & Submission
Updated on August 25, 2021 | View Project
9% Progress

100% Timing

Timeframe
August 25, 2021 → September 24, 2021
Current Phase
100 - Ordering & Submission
Updated on August 25, 2021 | View Project
9% Progress

100% Timing

Timeframe
August 25, 2021 → September 24, 2021
Current Phase
100 - Ordering & Submission
Updated on August 25, 2021 | View Project
9% Progress

100% Timing

Timeframe
August 25, 2021 → September 24, 2021
Current Phase
100 - Ordering & Submission
Updated on August 25, 2021 | View Project
9% Progress

100% Timing

Timeframe
August 25, 2021 → September 24, 2021
Current Phase
100 - Ordering & Submission
Updated on August 25, 2021 | View Project
9% Progress

100% Timing

Timeframe
August 25, 2021 → September 24, 2021
Current Phase
100 - Ordering & Submission
Updated on August 25, 2021 | View Project
9% Progress

100% Timing

Timeframe
August 25, 2021 → September 24, 2021
Current Phase
100 - Ordering & Submission
Updated on August 23, 2021 | View Project
9% Progress

100% Timing

Timeframe
August 23, 2021 → September 17, 2021
Current Phase
100 - Ordering & Submission
Updated on August 22, 2021 | View Project
9% Progress

100% Timing

Timeframe
August 22, 2021 → September 15, 2021
Current Phase
100 - Ordering & Submission
Updated on August 19, 2021 | View Project
9% Progress

100% Timing

Timeframe
August 19, 2021 → September 18, 2021
Current Phase
100 - Ordering & Submission
Updated on August 19, 2021 | View Project
9% Progress

100% Timing

Timeframe
August 19, 2021 → September 18, 2021
Current Phase
100 - Ordering & Submission
Updated on August 17, 2021 | View Project
9% Progress

100% Timing

Timeframe
August 17, 2021 → September 13, 2021
Current Phase
100 - Ordering & Submission
Updated on August 6, 2021 | View Project
9% Progress

100% Timing

Timeframe
August 6, 2021 → August 24, 2021
Current Phase
100 - Ordering & Submission
Updated on August 6, 2021 | View Project
9% Progress

100% Timing

Timeframe
August 6, 2021 → August 24, 2021
Current Phase
100 - Ordering & Submission
Updated on August 5, 2021 | View Project
9% Progress

100% Timing

Timeframe
August 5, 2021 → September 4, 2021
Current Phase
100 - Ordering & Submission
Updated on August 4, 2021 | View Project
9% Progress

100% Timing

Timeframe
August 4, 2021 → September 3, 2021
Current Phase
100 - Ordering & Submission
Updated on July 29, 2021 | View Project
18% Progress

100% Timing

Timeframe
July 29, 2021 → August 27, 2021
Current Phase
100 - Ordering & Submission
Updated on July 28, 2021 | View Project
8% Progress

100% Timing

Timeframe
July 28, 2021 → October 15, 2021
Current Phase
100 - Ordering & Submission
Updated on July 26, 2021 | View Project
8% Progress

100% Timing

Timeframe
July 26, 2021 → August 14, 2021
Current Phase
100 - Ordering & Submission
Updated on July 26, 2021 | View Project
8% Progress

100% Timing

Timeframe
July 26, 2021 → August 23, 2021
Current Phase
100 - Ordering & Submission
Updated on July 23, 2021 | View Project
8% Progress

100% Timing

Timeframe
July 23, 2021 → August 12, 2021
Current Phase
100 - Ordering & Submission
Updated on July 22, 2021 | View Project
8% Progress

100% Timing

Timeframe
July 22, 2021 → August 22, 2021
Current Phase
100 - Ordering & Submission
Updated on July 21, 2021 | View Project
8% Progress

100% Timing

Timeframe
July 21, 2021 → August 16, 2021
Current Phase
100 - Ordering & Submission
Updated on July 20, 2021 | View Project
8% Progress

100% Timing

Timeframe
July 20, 2021 → August 10, 2021
Current Phase
100 - Ordering & Submission
Updated on July 20, 2021 | View Project
8% Progress

100% Timing

Timeframe
July 20, 2021 → August 19, 2021
Current Phase
100 - Ordering & Submission
Updated on July 20, 2021 | View Project
8% Progress

100% Timing

Timeframe
July 20, 2021 → August 2, 2021
Current Phase
100 - Ordering & Submission
Updated on July 20, 2021 | View Project
8% Progress

100% Timing

Timeframe
July 20, 2021 → September 20, 2021
Current Phase
100 - Ordering & Submission
Updated on July 19, 2021 | View Project
8% Progress

100% Timing

Timeframe
July 19, 2021 → August 23, 2021
Current Phase
100 - Ordering & Submission
Updated on July 15, 2021 | View Project
8% Progress

100% Timing

Timeframe
July 15, 2021 → August 3, 2021
Current Phase
100 - Ordering & Submission
Updated on July 14, 2021 | View Project
8% Progress

100% Timing

Timeframe
July 14, 2021 → August 19, 2021
Current Phase
100 - Ordering & Submission
Updated on July 13, 2021 | View Project
8% Progress

100% Timing

Timeframe
July 13, 2021 → August 16, 2021
Current Phase
100 - Ordering & Submission
Updated on July 13, 2021 | View Project
8% Progress

100% Timing

Timeframe
July 13, 2021 → August 4, 2021
Current Phase
100 - Ordering & Submission
Updated on July 9, 2021 | View Project
8% Progress

100% Timing

Timeframe
July 9, 2021 → August 3, 2021
Current Phase
100 - Ordering & Submission
Updated on July 7, 2021 | View Project
8% Progress

100% Timing

Timeframe
July 7, 2021 → July 30, 2021
Current Phase
100 - Ordering & Submission
Updated on July 7, 2021 | View Project
8% Progress

100% Timing

Timeframe
July 7, 2021 → July 26, 2021
Current Phase
100 - Ordering & Submission
Updated on July 6, 2021 | View Project
8% Progress

100% Timing

Timeframe
July 6, 2021 → July 30, 2021
Current Phase
100 - Ordering & Submission
Updated on July 1, 2021 | View Project
8% Progress

100% Timing

Timeframe
July 1, 2021 → July 30, 2021
Current Phase
100 - Ordering & Submission
Updated on June 30, 2021 | View Project
8% Progress

100% Timing

Timeframe
June 30, 2021 → July 21, 2021
Current Phase
100 - Ordering & Submission
Updated on June 29, 2021 | View Project
8% Progress

100% Timing

Timeframe
June 29, 2021 → July 30, 2021
Current Phase
100 - Ordering & Submission
Updated on June 28, 2021 | View Project
8% Progress

100% Timing

Timeframe
June 28, 2021 → July 26, 2021
Current Phase
100 - Ordering & Submission
Updated on June 24, 2021 | View Project
8% Progress

100% Timing

Timeframe
June 24, 2021 → June 24, 2021
Current Phase
100 - Ordering & Submission
Updated on June 23, 2021 | View Project
8% Progress

100% Timing

Timeframe
June 23, 2021 → August 28, 2021
Current Phase
100 - Ordering & Submission
Updated on June 22, 2021 | View Project
8% Progress

100% Timing

Timeframe
June 22, 2021 → July 26, 2021
Current Phase
100 - Ordering & Submission
Updated on June 22, 2021 | View Project
8% Progress

100% Timing

Timeframe
June 22, 2021 → July 20, 2021
Current Phase
100 - Ordering & Submission
Updated on June 18, 2021 | View Project
8% Progress

100% Timing

Timeframe
June 18, 2021 → August 18, 2021
Current Phase
100 - Ordering & Submission
Updated on June 16, 2021 | View Project
8% Progress

100% Timing

Timeframe
June 16, 2021 → July 16, 2021
Current Phase
100 - Ordering & Submission
Updated on June 15, 2021 | View Project
8% Progress

100% Timing

Timeframe
June 15, 2021 → July 9, 2021
Current Phase
100 - Ordering & Submission
Updated on June 14, 2021 | View Project
8% Progress

100% Timing

Timeframe
June 14, 2021 → July 5, 2021
Current Phase
100 - Ordering & Submission
Updated on June 8, 2021 | View Project
8% Progress

100% Timing

Timeframe
June 8, 2021 → June 25, 2021
Current Phase
100 - Ordering & Submission
Updated on June 3, 2021 | View Project
8% Progress

100% Timing

Timeframe
June 3, 2021 → June 19, 2021
Current Phase
100 - Ordering & Submission
Updated on June 1, 2021 | View Project
8% Progress

100% Timing

Timeframe
June 1, 2021 → June 30, 2021
Current Phase
100 - Ordering & Submission
Updated on May 27, 2021 | View Project
8% Progress

100% Timing

Timeframe
May 27, 2021 → June 24, 2021
Current Phase
100 - Ordering & Submission
Updated on May 27, 2021 | View Project
8% Progress

100% Timing

Timeframe
May 27, 2021 → June 24, 2021
Current Phase
100 - Ordering & Submission
Updated on May 27, 2021 | View Project
8% Progress

100% Timing

Timeframe
May 27, 2021 → June 21, 2021
Current Phase
100 - Ordering & Submission
Updated on May 25, 2021 | View Project
18% Progress

100% Timing

Timeframe
May 25, 2021 → June 2, 2021
Current Phase
100 - Ordering & Submission
Updated on May 24, 2021 | View Project
8% Progress

100% Timing

Timeframe
May 24, 2021 → June 26, 2021
Current Phase
100 - Ordering & Submission
Updated on May 21, 2021 | View Project
8% Progress

100% Timing

Timeframe
May 21, 2021 → June 18, 2021
Current Phase
100 - Ordering & Submission
Updated on May 14, 2021 | View Project
8% Progress

100% Timing

Timeframe
May 14, 2021 → June 30, 2021
Current Phase
100 - Ordering & Submission
Updated on May 11, 2021 | View Project
8% Progress

100% Timing

Timeframe
May 11, 2021 → May 31, 2021
Current Phase
100 - Ordering & Submission
Updated on May 11, 2021 | View Project
8% Progress

100% Timing

Timeframe
May 11, 2021 → June 1, 2021
Current Phase
100 - Ordering & Submission
Updated on May 7, 2021 | View Project
8% Progress

100% Timing

Timeframe
May 7, 2021 → May 26, 2021
Current Phase
100 - Ordering & Submission
Updated on May 6, 2021 | View Project
8% Progress

100% Timing

Timeframe
May 6, 2021 → May 30, 2021
Current Phase
100 - Ordering & Submission
Updated on April 30, 2021 | View Project
8% Progress

100% Timing

Timeframe
April 30, 2021 → May 28, 2021
Current Phase
100 - Ordering & Submission
Updated on April 29, 2021 | View Project
8% Progress

100% Timing

Timeframe
April 29, 2021 → May 10, 2021
Current Phase
100 - Ordering & Submission
Updated on April 26, 2021 | View Project
8% Progress

100% Timing

Timeframe
April 26, 2021 → May 25, 2021
Current Phase
100 - Ordering & Submission
Updated on April 23, 2021 | View Project
8% Progress

100% Timing

Timeframe
April 23, 2021 → May 25, 2021
Current Phase
100 - Ordering & Submission
Updated on May 30, 2019 | View Project
100% Progress

100% Timing

Timeframe
May 23, 2019 → June 16, 2019
Updated on May 29, 2019 | View Project
100% Progress

100% Timing

Timeframe
May 14, 2019 → June 14, 2019
Updated on May 29, 2019 | View Project
100% Progress

100% Timing

Timeframe
May 14, 2019 → June 14, 2019
Updated on May 29, 2019 | View Project
100% Progress

100% Timing

Timeframe
May 14, 2019 → September 1, 2018
Updated on May 22, 2019 | View Project
100% Progress

100% Timing

Timeframe
May 15, 2019 → June 14, 2019
Updated on May 22, 2019 | View Project
100% Progress

100% Timing

Timeframe
May 17, 2019 → June 14, 2019
Updated on May 17, 2019 | View Project
100% Progress

100% Timing

Timeframe
May 17, 2019 → June 20, 2019
Updated on May 16, 2019 | View Project
100% Progress

100% Timing

Timeframe
May 15, 2019 → June 14, 2019
Updated on May 13, 2019 | View Project
100% Progress

100% Timing

Timeframe
May 9, 2019 → May 30, 2019
Updated on May 13, 2019 | View Project
100% Progress

100% Timing

Timeframe
May 13, 2019 → June 6, 2019
Updated on May 6, 2019 | View Project
100% Progress

100% Timing

Timeframe
May 2, 2019 → May 15, 2019
Updated on May 6, 2019 | View Project
100% Progress

100% Timing

Timeframe
May 2, 2019 → May 30, 2019
Updated on May 3, 2019 | View Project
100% Progress

100% Timing

Timeframe
April 25, 2019 → May 15, 2019
Updated on May 2, 2019 | View Project
100% Progress

100% Timing

Timeframe
April 30, 2019 → May 15, 2019
Updated on May 2, 2019 | View Project
100% Progress

100% Timing

Timeframe
April 29, 2019 → May 15, 2019
Updated on May 1, 2019 | View Project
100% Progress

100% Timing

Timeframe
May 1, 2019 → May 31, 2019
Updated on April 30, 2019 | View Project
100% Progress

100% Timing

Timeframe
April 30, 2019 → May 15, 2019
Updated on April 29, 2019 | View Project
100% Progress

100% Timing

Timeframe
April 23, 2019 → May 15, 2019
Updated on April 29, 2019 | View Project
100% Progress

100% Timing

Timeframe
April 29, 2019 → May 15, 2019
Updated on April 24, 2019 | View Project
100% Progress

100% Timing

Timeframe
April 22, 2019 → May 15, 2019
Updated on April 19, 2019 | View Project
100% Progress

100% Timing

Timeframe
April 18, 2019 → May 15, 2019
Updated on April 19, 2019 | View Project
100% Progress

100% Timing

Timeframe
April 19, 2019 → May 10, 2019
Current Phase
400 - Funding & Post Closing
Updated on April 17, 2019 | View Project
100% Progress

100% Timing

Timeframe
April 9, 2019 → May 15, 2019
Current Phase
400 - Funding & Post Closing
Updated on April 17, 2019 | View Project
100% Progress

100% Timing

Timeframe
April 5, 2019 → May 15, 2019
Updated on April 17, 2019 | View Project
100% Progress

100% Timing

Timeframe
April 11, 2019 → May 15, 2019
Current Phase
400 - Funding & Post Closing
Updated on April 17, 2019 | View Project
100% Progress

100% Timing

Timeframe
April 9, 2019 → May 15, 2019
Updated on April 17, 2019 | View Project
100% Progress

100% Timing

Timeframe
April 9, 2019 → May 15, 2019
Updated on April 12, 2019 | View Project
100% Progress

100% Timing

Timeframe
April 8, 2019 → May 15, 2019
Updated on April 9, 2019 | View Project
100% Progress

100% Timing

Timeframe
April 9, 2019 → May 9, 2019
Updated on April 9, 2019 | View Project
100% Progress

100% Timing

Timeframe
April 9, 2019 → April 27, 2019
Current Phase
400 - Funding & Post Closing
Updated on April 5, 2019 | View Project
100% Progress

100% Timing

Timeframe
April 5, 2019 → April 26, 2019
Current Phase
400 - Funding & Post Closing
Updated on April 3, 2019 | View Project
100% Progress

100% Timing

Timeframe
April 2, 2019 → May 15, 2019
Updated on April 3, 2019 | View Project
100% Progress

100% Timing

Timeframe
April 2, 2019 → May 15, 2019
Updated on April 3, 2019 | View Project
100% Progress

100% Timing

Timeframe
April 2, 2019 → May 15, 2019
Updated on April 1, 2019 | View Project
100% Progress

100% Timing

Timeframe
March 29, 2019 → April 15, 2019
Updated on April 1, 2019 | View Project
100% Progress

100% Timing

Timeframe
March 27, 2010 → April 15, 2019
Updated on March 29, 2019 | View Project
100% Progress

100% Timing

Timeframe
March 29, 2019 → April 22, 2019
Updated on March 26, 2019 | View Project
100% Progress

100% Timing

Timeframe
March 26, 2019 → April 19, 2019
Current Phase
400 - Funding & Post Closing
Updated on March 26, 2019 | View Project
100% Progress

100% Timing

Timeframe
March 22, 2019 → April 15, 2019
100% Progress

100% Timing

Timeframe
March 22, 2019 → April 15, 2019
Updated on March 22, 2019 | View Project
100% Progress

100% Timing

Timeframe
March 22, 2019 → April 15, 2019
Updated on March 20, 2019 | View Project
100% Progress

100% Timing

Timeframe
March 20, 2019 → April 9, 2019
Updated on March 15, 2019 | View Project
100% Progress

100% Timing

Timeframe
March 15, 2019 → April 14, 2019
Updated on March 15, 2019 | View Project
100% Progress

100% Timing

Timeframe
March 14, 2019 → April 15, 2019
Updated on March 13, 2019 | View Project
100% Progress

100% Timing

Timeframe
March 6, 2019 → April 15, 2019
Updated on March 7, 2019 | View Project
100% Progress

100% Timing

Timeframe
March 7, 2019 → April 16, 2019
Updated on March 7, 2019 | View Project
100% Progress

100% Timing

Timeframe
March 5, 2019 → April 15, 2019
Updated on February 27, 2019 | View Project
100% Progress

100% Timing

Timeframe
February 27, 2019 → March 29, 2019
Updated on February 25, 2019 | View Project
100% Progress

100% Timing

Timeframe
February 17, 2019 → March 15, 2019
Updated on February 13, 2019 | View Project
100% Progress

100% Timing

Timeframe
February 11, 2019 → March 15, 2019
Updated on February 12, 2019 | View Project
100% Progress

100% Timing

Timeframe
February 6, 2019 → March 15, 2019
Updated on February 12, 2019 | View Project
100% Progress

100% Timing

Timeframe
February 6, 2019 → March 15, 2019
Updated on February 11, 2019 | View Project
100% Progress

100% Timing

Timeframe
January 24, 2019 → February 15, 2019
Updated on February 11, 2019 | View Project
100% Progress

100% Timing

Timeframe
February 11, 2019 → April 2, 2019
Updated on February 8, 2019 | View Project
100% Progress

100% Timing

Timeframe
January 7, 2019 → February 15, 2019
Updated on February 7, 2019 | View Project
100% Progress

100% Timing

Timeframe
February 25, 2019 → February 28, 2019
Updated on February 6, 2019 | View Project
100% Progress

100% Timing

Timeframe
January 29, 2019 → February 15, 2019
Current Phase
400 - Funding & Post Closing
Updated on February 6, 2019 | View Project
100% Progress

100% Timing

Timeframe
August 2, 2018 → September 1, 2018
100% Progress

100% Timing

Timeframe
September 13, 2018 → February 18, 2019
Updated on January 21, 2019 | View Project
100% Progress

100% Timing

Timeframe
January 21, 2019 → March 31, 2019
Updated on January 21, 2019 | View Project
100% Progress

100% Timing

Timeframe
January 17, 2019 → February 15, 2019
Updated on January 21, 2019 | View Project
100% Progress

100% Timing

Timeframe
January 15, 2019 → February 15, 2019
Updated on January 21, 2019 | View Project
100% Progress

100% Timing

Timeframe
January 16, 2019 → February 15, 2019
Updated on January 11, 2019 | View Project
100% Progress

100% Timing

Timeframe
January 9, 2019 → February 15, 2019
Current Phase
400 - Funding & Post Closing
Updated on January 11, 2019 | View Project
100% Progress

100% Timing

Timeframe
January 7, 2018 → January 15, 2019
Updated on January 10, 2019 | View Project
100% Progress

100% Timing

Timeframe
January 9, 2018 → February 9, 2018
Updated on January 9, 2019 | View Project
100% Progress

100% Timing

Timeframe
January 9, 2019 → February 5, 2019
Updated on January 4, 2019 | View Project
100% Progress

100% Timing

Timeframe
January 4, 2019 → January 28, 2019
Updated on January 4, 2019 | View Project
100% Progress

100% Timing

Timeframe
January 4, 2019 → January 26, 2019
Current Phase
400 - Funding & Post Closing
Updated on December 20, 2018 | View Project
100% Progress

100% Timing

Timeframe
December 18, 2018 → January 15, 2018
Updated on December 20, 2018 | View Project
100% Progress

100% Timing

Timeframe
December 17, 2018 → January 17, 2018
Updated on December 20, 2018 | View Project
100% Progress

100% Timing

Timeframe
December 20, 2018 → February 1, 2019
Current Phase
400 - Funding & Post Closing
Updated on December 18, 2018 | View Project
100% Progress

100% Timing

Timeframe
December 18, 2018 → January 15, 2019
Updated on December 13, 2018 | View Project
100% Progress

100% Timing

Timeframe
December 10, 2018 → January 15, 2018
Updated on December 11, 2018 | View Project
100% Progress

100% Timing

Timeframe
December 11, 2018 → January 11, 2019
Current Phase
400 - Funding & Post Closing
Updated on December 10, 2018 | View Project
100% Progress

100% Timing

Timeframe
December 10, 2018 → January 25, 2019
Current Phase
400 - Funding & Post Closing
Updated on November 27, 2018 | View Project
100% Progress

100% Timing

Timeframe
November 21, 2018 → December 14, 2018
Updated on November 26, 2018 | View Project
100% Progress

100% Timing

Timeframe
November 21, 2018 → December 14, 2018
Current Phase
400 - Funding & Post Closing
Updated on November 21, 2018 | View Project
100% Progress

100% Timing

Timeframe
August 28, 2018 → September 14, 2018
Current Phase
400 - Funding & Post Closing
Updated on November 15, 2018 | View Project
100% Progress

100% Timing

Timeframe
November 14, 2018 → December 15, 2018
Updated on November 15, 2018 | View Project
100% Progress

100% Timing

Timeframe
November 14, 2018 → December 14, 2018
Updated on November 14, 2018 | View Project
100% Progress

100% Timing

Timeframe
November 14, 2018 → November 30, 2018
Updated on November 7, 2018 | View Project
100% Progress

100% Timing

Timeframe
November 7, 2018 → December 4, 2018
Current Phase
400 - Funding & Post Closing
Updated on November 6, 2018 | View Project
100% Progress

100% Timing

Timeframe
November 2, 2018 → December 14, 2018
Updated on November 2, 2018 | View Project
100% Progress

100% Timing

Timeframe
October 25, 2018 → November 15, 2018
Current Phase
400 - Funding & Post Closing
Updated on October 30, 2018 | View Project
100% Progress

100% Timing

Timeframe
October 10, 2018 → November 15, 2018
Updated on October 30, 2018 | View Project
100% Progress

100% Timing

Timeframe
October 26, 2018 → December 10, 2018
Updated on October 29, 2018 | View Project
100% Progress

100% Timing

Timeframe
October 29, 2018 → November 3, 2018
Updated on October 24, 2018 | View Project
100% Progress

100% Timing

Timeframe
October 18, 2018 → November 15, 2018
100% Progress

100% Timing

Timeframe
October 23, 2018 → November 7, 2018
Updated on October 18, 2018 | View Project
100% Progress

100% Timing

Timeframe
September 7, 2018 → October 30, 2018
Updated on October 18, 2018 | View Project
0% Progress
Current Phase
Daily Tasks
Updated on October 18, 2018 | View Project
95% Progress
Current Phase
Daily Tasks
Updated on October 18, 2018 | View Project
0% Progress
Current Phase
Daily Tasks
Updated on October 18, 2018 | View Project
0% Progress
Current Phase
Daily Tasks
Updated on October 17, 2018 | View Project
100% Progress

100% Timing

Timeframe
October 17, 2018 → November 15, 2018
Updated on October 17, 2018 | View Project
100% Progress

100% Timing

Timeframe
September 13, 2018 → October 15, 2018
Current Phase
400 - Funding & Post Closing
Updated on October 15, 2018 | View Project
100% Progress

100% Timing

Timeframe
August 2, 2018 → September 1, 2018
Updated on October 15, 2018 | View Project
100% Progress

100% Timing

Timeframe
August 2, 2018 → September 1, 2018
Updated on October 15, 2018 | View Project
100% Progress

100% Timing

Timeframe
August 2, 2018 → September 1, 2018
Updated on October 15, 2018 | View Project
100% Progress

100% Timing

Timeframe
August 2, 2018 → September 1, 2018
Updated on October 15, 2018 | View Project
100% Progress

100% Timing

Timeframe
August 2, 2018 → September 1, 2018
Updated on October 15, 2018 | View Project
100% Progress

100% Timing

Timeframe
August 2, 2018 → September 1, 2018
Updated on October 15, 2018 | View Project
100% Progress

100% Timing

Timeframe
September 12, 2018 → October 1, 2018
Updated on October 15, 2018 | View Project
100% Progress

100% Timing

Timeframe
August 2, 2018 → September 1, 2018
Updated on October 15, 2018 | View Project
100% Progress

100% Timing

Timeframe
September 26, 2018 → October 15, 2018
Updated on October 17, 2018 | View Project
100% Progress

100% Timing

Timeframe
July 17, 2018 → October 31, 2018
Updated on October 15, 2018 | View Project
100% Progress

100% Timing

Timeframe
September 18, 2018 → November 15, 2018
Updated on October 15, 2018 | View Project
100% Progress

100% Timing

Timeframe
August 11, 2018 → November 15, 2018
Updated on October 15, 2018 | View Project
100% Progress

100% Timing

Timeframe
October 1, 2018 → October 19, 2018
Updated on February 5, 2019 | View Project
100% Progress

100% Timing

Timeframe
September 24, 2018 → October 27, 2018
Updated on October 15, 2018 | View Project
100% Progress

100% Timing

Timeframe
September 10, 2018 → October 12, 2018
Update Status
Document Status Updated
Notifications have been sent.